Construction compliance

Never pay an uninsured subcontractor.
The contract sets the requirements. Kernos makes payment obey them.

Your prime contract already states what every sub must carry. Kernos turns those requirements into objects, checks each certificate against them, and keeps payment applications blocked until a qualified approver clears the gaps — so the money moves only when the coverage is real.

Standard forms: ACORD 25 · CG 20 10 · CG 20 37 · WC 00 03 01 A — parsed and compared, not filed away.

The exposure

When a sub is uninsured, the claim climbs to you.

Subcontractor work is where general contractors lose money — and the spreadsheet tracking it was never built to verify anything.

Claims

65% of GC claims start with subs

About 65% of general contractor claims originate from subcontractor work, and the average subcontractor liability claim runs around $125K.

Attribution: industry insurance analyses

Coverage gaps

1 in 17 lacks required workers’ comp

A 2026 analysis of California active contractor licenses against regulator data found roughly 1 in 17 non-exempt contractors lacks required workers’ compensation coverage.

Attribution: California regulator-data analysis

Tracking drag

10–15 hours a week, per coordinator

Manual certificate tracking consumes an estimated 10–15 hours per coordinator per week — $20K+ per year, per person, spent recording receipts instead of verifying coverage.

  • A GC with 15 subs faces roughly 45 COI expirations a year across GL, WC, and umbrella lines

Attribution: industry estimates

Certificate is not compliance

What tracking misses.

The ACORD 25 in your inbox is a snapshot, not a promise. Three gaps hide between the paper you file and the policy that would actually respond.

No rights on paper

The certificate grants nothing

ACORD’s own guidance: a certificate listing additional insured or waiver of subrogation grants the holder no rights under the policy. Rights come only from the actual policy endorsements — if the endorsement was never issued, the certificate line is decoration.

The notice myth

Nobody is watching for cancellation

Since 2009 the ACORD 25 removed the days-of-notice blank: cancellation notice follows policy provisions, and the certificate holder receives nothing unless it is endorsed as a cancellation notice recipient. Most tracked subs never named you.

Liability is local

Control decides who pays

Courts have held general contractors liable for subcontractor injuries where the GC retained control of site safety — and courts in other states have found the opposite. Your protection depends on endorsements, not intentions.

Deep dive: why COI tracking spreadsheets fail general contractors.

How the loop works

From prime contract to cleared payment.

The contract states the requirements. Kernos makes payment obey them — six steps, none of them optional, none of them bypassable.

01 · Extract

Requirements become objects

Insurance requirements are extracted from the prime contract as typed objects — limits, endorsement requirements, notice recipients — not paragraphs in a PDF.

02 · Compare

Every certificate is checked

A rules engine compares each certificate against the contract requirements: coverage lines, limits, policy dates, and the endorsement forms behind every promised status.

03 · Flag

Gaps become exceptions

A missing CG 20 37 or a limit below contract is not a note in a spreadsheet — it becomes an exception with a named owner and a due date.

04 · Chase

The follow-up is automatic

Chase emails go out on renewal dates and open exceptions until the gap closes. Expirations stop being a weekend surprise.

05 · Gate

Payment waits for approval

Payment applications stay blocked until a qualified approver clears the exceptions — and the initiator cannot self-approve. The loop is not bypassed to keep things moving.

06 · Record

The chain is append-only

Every certificate, exception, chase, and approval lands in an append-only audit chain — who saw what, who decided, when, immutable after the fact.

Inputs

What Kernos reads.

No new paperwork for your subs. Kernos reads the standard forms already circulating on your projects and compares their limits and dates against the requirements in your prime contract.

Certificates

ACORD 25

Certificates of liability insurance, parsed line by line: coverage lines, per-occurrence and aggregate limits, policy effective and expiration dates, certificate holder block.

Additional insured

CG 20 10 and CG 20 37

The endorsement forms behind “additional insured”: CG 20 10 for ongoing operations, CG 20 37 for completed operations — read for who is actually covered, at which limits, for how long.

Waiver of subrogation

WC 00 03 01 A

Workers’ compensation waiver-of-subrogation endorsements, checked against the written contract requirement — because a checkbox on a certificate is not the endorsement.

Pricing

Subcontractor units, not abstract meters.

Same published plans as the platform, translated into construction units. No "contact sales" wall. The per-subcontractor meter is finalized with you during the pilot, not sprung on you later.

PlanFitsPrice
StarterSmall crews — up to ~20 active subcontractors. Requirement extraction, chase emails, payment gating, full audit chain.$500/mo
ProfessionalMulti-project GCs — up to ~100 active subcontractors. Private-cloud options, priority support.$2,000/mo
EnterpriseCompliance teams and high subcontractor volume. Private cloud or air-gapped, SLA.Custom
PilotFirst project, 60 days, the full loop on your real contract and subcontractors. First three customers.$1,500 flat

Optional one-time data diagnostic: $500–2,000, credited against the pilot if you continue. Published prices are the current anchor — final metering (per active subcontractor) is set together during the pilot.

Data & trust

Your contracts and certificates never leave your perimeter.

Kernos deploys in your environment. Prime contracts, certificates, exception queues, and the audit chain stay inside your instance; what crosses to us is a support conversation, not your project data. Every check is visible, every approval is attributable, and the whole chain is stored where you control it.

Early access

Put your payment run behind the rules.

Tell us how your subcontractor compliance works today — we reply personally, usually the same day. No mailing list without your consent.

Prefer email? hello@eunomos.io — we store only what you type here (see Privacy).

Direct email works too: hello@eunomos.io — put “Construction” in the subject.